Bolltau Pen Soced Di-staen
Safon: JIS B 1176
Math o Thread: Thread Bras / Thread Fine
Hyd Edefyn: Thread Llawn / Rhannol Thread
Nwyddau: Bolltau Pen Soced Di-staen
Enw arall: Bolltau Cap Soced
Deunydd: Dur Di-staen
Dosbarth Eiddo: Llai na neu'n hafal i M20: A2-70, A4-70; > M20 Llai na neu'n hafal i M39: A2-50, A4-50
Diamedr: M1.6, M2, M2.5, M3, M4, M5, M6, M8, M10, M12, (M14), M16, (M18), M20, (M22), M24, (M27), M30, (M33), M36, M42, M48, M56, M64
Gorffen: Plaen, Passivated, Customization
Math o Ben: Pen Soced
Math Drive: Soced Hecsagon
MOQ: 1000kgs
Amser Arweiniol: 30 i 60 diwrnod
Cyflwyniad Cynnyrch

Fel cyflenwr byd-eang o atebion cau wedi'u haddasu, mae proses gwasanaeth AYA hefyd mor agos at gwsmeriaid â chynhyrchion AYA. O ddisgrifio anghenion i wasanaethau dilynol, bydd AYA yn brydlon ac yn gwneud unrhyw ymdrech i helpu cwsmeriaid i ddatrys unrhyw broblemau cau sy'n codi, i ddileu pryder cwsmeriaid.
DISGRIFIAD CYNNYRCH
| Enw Cynnyrch | Bolltau Pen Soced Di-staen |
| Enwir hefyd | Bolltau Cap Soced |
| Deunydd | Dur Di-staen |
| Safonol | JIS B 1176 |
| Dosbarth Eiddo | Llai na neu'n hafal i M20: A2-70, A4-70; > M20 Llai na neu'n hafal i M39: A2-50, A4-50 |
|
Diamedr |
M1.6, M2, M2.5, M3, M4, M5, M6, M8, M10, M12, (M14), M16, (M18), M20, (M22), M24, (M27), M30, (M33), M36, M42, M48, M56, M64 |
| Gorffen | Plaen / Passivated / Customization |
| Math Pen | Pen Soced |
| Math Drive | Soced Hecsagon |
| Math Edau | Thread Bras / Thread Fine |
| Hyd y Trywydd | Edau Llawn / Rhannol Thread |
TABL DIMENSIYNAU

| Maint Edau | M1.6 | M2 | M2.5 | M3 | M4 | M5 | M6 | M8 | M10 | M12 | ||||
| d | ||||||||||||||
| P | Cae | edau bras | 0.35 | 0.4 | 0.45 | 0.5 | 0.7 | 0.8 | 1 | 1.25 | 1.5 | 1.75 | ||
| Edau mân, 1 | - | - | - | - | - | - | - | 1 | 1 | 1.5 | ||||
| Edau mân, 2 | - | - | - | - | - | - | - | - | -1.25 | -1.25 | ||||
| b | Cyf. | 15 | 16 | 17 | 18 | 20 | 22 | 24 | 28 | 32 | 36 | |||
| dk | .max | Am bennau plaen | 3 | 3.8 | 4.5 | 5.5 | 7 | 8.5 | 10 | 13 | 16 | 18 | ||
| Am bennau crychlyd | 3.14 | 3.98 | 4.68 | 5.68 | 7.22 | 8.72 | 10.22 | 13.27 | 16.27 | 18.27 | ||||
| min | 2.86 | 3.62 | 4.32 | 5.32 | 6.78 | 8.28 | 9.78 | 12.73 | 15.73 | 17.73 | ||||
| DS | .max | 1.6 | 2 | 2.5 | 3 | 4 | 5 | 6 | 8 | 10 | 12 | |||
| min | 1.46 | 1.86 | 2.36 | 2.86 | 3.82 | 4.82 | 5.82 | 7.78 | 9.78 | 11.73 | ||||
| k | .max | 1.6 | 2 | 2.5 | 3 | 4 | 5 | 6 | 8 | 10 | 12 | |||
| Munud | 1.46 | 1.86 | 2.36 | 2.86 | 3.82 | 4.82 | 5.7 | 7.64 | 9.64 | 11.57 | ||||
| s | Maint Enwol | 1.5 | 1.5 | 2 | 2.5 | 3 | 4 | 5 | 6 | 8 | 10 | |||
| .max | 1.58 | 1.58 | 2.08 | 2.58 | 3.08 | 4.095 | 5.14 | 6.14 | 8.175 | 10.175 | ||||
| Munud | 1.52 | 1.52 | 2.02 | 2.52 | 3.02 | 4.02 | 5.02 | 6.02 | 8.025 | 10.025 | ||||
| t | Munud | 0.7 | 1 | 1.1 | 1.3 | 2 | 2.5 | 3 | 4 | 5 | 6 | |||
| Maint Edau | (M14) | M16 | M20 | M24 | M30 | M36 | M42 | M48 | M56 | M64 | ||||
| d | ||||||||||||||
| P | Cae | edau bras | 2 | 2 | 2.5 | 3 | 3.5 | 4 | 4.5 | 5 | 5.5 | 6 | ||
| Edau mân, 1 | - | 1.5 | 1.5 | 2 | 2 | 3 | - | - | - | - | ||||
| Edau mân, 2 | -1.5 | - | -2 | - | - | - | - | - | - | - | ||||
| b | Cyf. | 40 | 44 | 52 | 60 | 72 | 84 | 96 | 108 | 124 | 140 | |||
| dk | .max | Am bennau plaen | 21 | 24 | 30 | 36 | 45 | 54 | 63 | 72 | 84 | 96 | ||
| Am bennau crychlyd | 21.33 | 24.33 | 30.33 | 36.39 | 45.39 | 54.46 | 63.46 | 72.46 | 84.54 | 96.54 | ||||
| Munud | 20.67 | 23.67 | 29.67 | 35.61 | 44.61 | 53.54 | 62.54 | 71.54 | 83.46 | 95.46 | ||||
| DS | .max | 14 | 16 | 20 | 24 | 30 | 36 | 42 | 48 | 56 | 64 | |||
| Munud | 13.73 | 15.73 | 19.67 | 23.67 | 29.67 | 35.61 | 41.61 | 47.61 | 55.54 | 63.54 | ||||
| k | .max | 14 | 16 | 20 | 24 | 30 | 36 | 42 | 48 | 56 | 64 | |||
| Munud | 13.57 | 15.57 | 19.48 | 23.48 | 29.48 | 35.38 | 41.38 | 47.38 | 55.26 | 63.26 | ||||
| s | Maint Enwol | 12 | 14 | 17 | 19 | 22 | 27 | 32 | 36 | 41 | 46 | |||
| .max | 12.212 | 14.212 | 17.23 | 19.275 | 22.275 | 27.275 | 32.33 | 36.33 | 41.33 | 46.33 | ||||
| Munud | 12.032 | 14.032 | 17.05 | 19.065 | 22.065 | 27.065 | 32.08 | 36.08 | 41.08 | 46.08 | ||||
| t | Munud | 7 | 8 | 10 | 12 | 15.5 | 19 | 24 | 28 | 34 | 38 | |||
MANYLION CYNNYRCH

MANTEISION CYNNYRCH

MANTEISION
1. Defnyddir bolltau pen soced di-staen mewn amrywiol gymwysiadau lle mae angen datrysiad cau diogel a chadarn.
2. Mae dur di-staen yn gallu gwrthsefyll rhwd a chorydiad yn fawr, gan wneud y bolltau hyn yn addas ar gyfer cymwysiadau dan do ac awyr agored, yn ogystal ag amgylcheddau sy'n agored i leithder neu gemegau.
3. Mae gan ddur di-staen ymddangosiad glân a chaboledig, gan ei gwneud yn ddewis poblogaidd mewn cymwysiadau lle mae estheteg yn bwysig.
4. Mae bolltau pen soced di-staen ar gael mewn gwahanol feintiau, hyd, a mathau o edau i ddarparu ar gyfer gwahanol ofynion. Mae'n hanfodol dewis y maint a'r radd bollt priodol yn seiliedig ar y gofynion cais a llwyth penodol.
AROLYGIAD ANSAWDD

PACIO A LLWYTHO CYNHWYSYDDION

SENARIOS DEFNYDD

PAM AYA?
Mae AYA yn darparu gwasanaethau unigryw i 1000 a mwy o aelodau o bob cwr o'r byd bob blwyddyn, gyda system datrysiad gwasanaeth cadwyn unigryw, dim ond clicio ar y llygoden sydd angen i chi gael yr ateb cau unigryw a mwynhau gwasanaethau drws-i-ddrws.
Tagiau poblogaidd: bolltau pen soced di-staen, Tsieina, cyflenwyr, gweithgynhyrchwyr, ffatri, prynu, pris, ar werth, a wnaed yn Tsieina













